Perpustakaan PEM Akamigas

  • Beranda
  • Informasi
  • Berita
  • Bantuan
  • Pustakawan
  • Area Anggota
  • Pilih Bahasa :
    Bahasa Arab Bahasa Bengal Bahasa Brazil Portugis Bahasa Inggris Bahasa Spanyol Bahasa Jerman Bahasa Indonesia Bahasa Jepang Bahasa Melayu Bahasa Persia Bahasa Rusia Bahasa Thailand Bahasa Turki Bahasa Urdu

Pencarian berdasarkan :

SEMUA Pengarang Subjek ISBN/ISSN Pencarian Spesifik

Pencarian terakhir:

{{tmpObj[k].text}}
No image available for this title
Penanda Bagikan

Artikel

The Prediction of Scaling Silica Potential on Brine Flow Pipes from Cluster X to Cluster Y at Lahendong Geothermal Field

Hendra Ardi Kurniawan - Nama Orang; Diyah Rosiani - Nama Orang; AChmad Djumarma Wirakusumah - Nama Orang;

In general, the geothermal reservoir in Indonesia is water dominated that produce steam and brine. The brine that produce is contained by silica, so that the brine needs a cooling process executed in pond. This process aims to precipitate silica contained in the brine, so that the occurrence of silica scaling in the pumping process towards the injection well could be avoided, yet based this study, the result shows that the silica still carried and deposited in the pipes during the pumping process. That result shows that there are 32.89 ppm of silica deposited on pipe while pumping process. Furthermore, the pressure and temperature changes trigger the solubility change of silica in brine and that caused about 1.4℃ heat loss to occurred while pumping process happened from inlet until outlet pipe. This study aims to model the prediction of silica scaling based on physical changes in the brine flow pipe. This modeling prediction connects the solubility of silica to temperature and pressure changes along the pipes which can ultimately be obtained in effective and efficient time in cleaning brine pipe. The calculation model designed and validated with data and the result shows that the appropriate mass flow rate is 143.306 kg/s and 0.363% for deposition factor of silica. From this model, it is possible obtain the inside diameter of the pipe after a certain time interval due to the presence of the silica precipitation using the equation: ID = -0.0085522624(time) + 0.3339882740. Furthermore, with the mass flow rate and the deposition of silica assumed constant, the inside diameter predicted will be almost full of scale silica after 35.1 months or 2.9 years.


Ketersediaan

Tidak ada salinan data

Informasi Detail
Judul Seri
-
No. Panggil
-
Penerbit
Jakarta : INAGA., 2017
Deskripsi Fisik
-
Bahasa
English
ISBN/ISSN
-
Klasifikasi
NONE
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
-
Edisi
-
Subjek
Scaling Silica
Lahendong
Lahendong Geothermal Field
Info Detail Spesifik
-
Pernyataan Tanggungjawab
-
Versi lain/terkait

Tidak tersedia versi lain

Lampiran Berkas
  • Keabsahan Karya Ilmiah
  • The Prediction of Scaling Silica Potential on Brine Flow Pipes from Cluster X to Cluster Y at Lahendong Geothermal Field
  • Peer Review Prosiding Scaling Silica
  • Similarity Checking (Turnitin)
Komentar

Anda harus masuk sebelum memberikan komentar

Perpustakaan PEM Akamigas
  • Informasi
  • Layanan
  • Pustakawan
  • Area Anggota

Tentang Kami

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Cari

masukkan satu atau lebih kata kunci dari judul, pengarang, atau subjek

Donasi untuk SLiMS Kontribusi untuk SLiMS?

© 2026 — Senayan Developer Community

Ditenagai oleh SLiMS
Pilih subjek yang menarik bagi Anda
  • Karya Umum
  • Filsafat
  • Agama
  • Ilmu-ilmu Sosial
  • Bahasa
  • Ilmu-ilmu Murni
  • Ilmu-ilmu Terapan
  • Kesenian, Hiburan, dan Olahraga
  • Kesusastraan
  • Geografi dan Sejarah
Icons made by Freepik from www.flaticon.com
Pencarian Spesifik
Kemana ingin Anda bagikan?